Comic Relief

This was an in-situ office refurbishment with 6 phases over a 20 week period. The challenge was to keep a tight reign on the programme and budget to ensure perfect delivery. Comic Relief required workplace design and fit-out solution that would allow them to work to their full potential with room for expansion.

Please click the link below for the full Comic Relief Case Study.
 