300 South Oak Way, Reading
139,239 sq ft
300-South-Oak-Way-Offices-Green-Park-Reading-Huawei-Offices
Green-Park-Reading-Huawei-Offices---Workplace-Design-Office-Fit-Out
Green-Park-Reading-Huawei-Offices---Workplace-Design-Office-Fit-Out-Office-Building-Shell

300 South Oak Way, Reading

Overview
300 South Oak Way, Green Park Reading has been designed and constructed to a very high standard. The property comprises a modern five-storey office building. The property is located in Greenpark which is located with good access to junction 11 of the M4 and approximately 3 miles from Reading Town Centre where the mainline station provides services to London Paddington.

Maris Expertise
Maris have completed a 144,000 sq ft office design & fit-out scheme for Huawei at Green Park. The Project was a relocation project from Huawei’s old office in Basingstoke to a purpose-designed UK operations centre with a canteen/tea-point, building security arrangements, graphics and way-finding and all acoustic and partitioning requirements.

Substructure
Traditional mass concrete on piled foundations

Superstructure
Steel frame

Floor Loading Offices
4.1KN/m2 (+1KN for partitioning)
Basement and plant enclosures at 6.15KN/m2

Façade
Retained façades refurbished with new double glazed timber sash windows. Secondary glazing is anticipated for the existing lead windows

Roof
The 4th floor roof is a mix of extensive and semi-intensive green roof systems. The 5th floor roof deck is a traditional mansard construction to the perimeters using Welsh Slate on timber rafters with lead detailing

Planning Module
1.5m

Raised Floor Zone
100mm

Slab to Slab Height
3,280mm – 3,770mm

Noise Rating
Offices (open plan) NR38
Reception NR40
WC Areas NR40

Entrance Hall
Double height glazing

WC / Bathroom Facilities
Male – 4no. WCs, 4no. wash-hand basins
Female – 4no. WCs, 4no. wash-hand basins
Disabled WC – 2no. WC, 2no. wash-hand basin. 2 no. showers

Cycle Provisions
At basement level

Raised Floors
100mm raised 600mm x 600mm, wrapped galvanised steel on adjustable pedestals

Ceilings
Plaster margin to metal plank 1,500mm x 300mm plank approximately

Walls
Painted plaster or dry lining with painted MDF skirting

Doors, Frames & Skirting
Skirting – 100mm recessed painted MDF
Doors – Solid core with hardwood veneered face with a matching hardwood lipping.
Riser doors – painted doors with painted frames

Air Conditioning Load Allowance
Lighting 12 w/m2
Power 15 w/m2
Occupants 10 w/m2

Mechanical Services
3 pipe fan-coil system

Ventilation
12 litres per second per person (1no. person per 10m2)

Electrical Design Criteria
Standard power allowance for future tenant under floor power 15w/m2
Lighting allowance – base build + TBC%
Spare capacity at riser – base build + TBC%

Electrical Services
A new EDF Energy sub-station located at ground floor having a single 600A/400kVA (LV) supply
New distribution boards located within the riser onto the floor space

Lighting Design Criteria
Office areas – 400 lux at desk level
Corridor / WC areas – 200 lux
Reception – 250 lux
Plant rooms – 150 lux

Lighting
“Slotlight 2” and compact downlighters, with daylight saving mode where applicable
Controls Simmtronic lighting control modules attached to PIR and daylight saving sensors

Data
No cabling present

Lifts
2no. 10 person passenger lifts

Design Criteria
Design Criteria General occupancy – 1 person per 10m2
Lifts – 1 person per 12m2
WC / bathrooms – 1 person per 10m2
Ventilation Limiting Factor 156 persons
WC / Bathroom Limiting Factor 100 persons
Emergency Escape Door / Staircase Widths 162 persons

Sustainability
BREEAM Rating Excellent

Address


Size
139,239 sq ft
Landlord
Oxford Properties
Year
2001
Letting Agents
N/A